Client

Tata Projects Limited. Mumbai

YEAR

2018-2019

Location

Bharat Net Phase-II , Chhattisgarh

Overview

WHAT WAS NEEDED?

The State Network operations centre (S-NOC) for monitoring & control of the state high speed optical network spread across 85 blocks & 5,987 gram panchayats in 27 districts. Hence, requirement of SITC of video wall for NOC.

SOLUTION PROVIDED

  • 50” HD Laser Lit extra Slim Videowall with HD resolutions in 13 x 3 matrix (39 Nos. Cube).
  • Video wall controller & Accessories

INSTALLATION

This is an indoor installation comprises of 39 cubes video wall of (13x3) of 50” each of rear projection full HD.

OUTCOME

Perfect duly complied as per tender specification & helped brought rural population in proximity with the State digital economy and command and control.